Completed for the Halton Region, RITESTART was responsible for the replacement of existing back-up power systems at Cedarvale Well House 4/4A. The scope included the removal and replacement of a diesel generator complete with fuel and exhaust piping, electrical distribution upgrades, oil containment curbs as well as a new epoxy floor system throughout. A new underground feed for permanent power had also been replaced and had been completed via directional boring.