Contracted by the City of Brantford, RITESTART had replaced the back up power systems at the Tollgate Reservoir and Pumping Station. To facilitate the generator, RITESTART was required to install a new exterior concrete pad complete with integrated retaining walls and galvanized steel handrails, supply a sound barrier partition around perimeter as well as all the necessary electrical infrastructure to support the new equipment. To ensure that electrical service remained uninterrupted, a temporary generator was provided and on standby during the switchover.